Ok, so I understand that when you collect data from a point you consider data from previous points? I had an ideia that the information of each point was independent and the path was considered for the final calculations. The problem is that I have a some points wrongly marked and I prefer to loose them then to redo it all over again. It’s about 1000sq meters of openspaces and offices. Anyway, thanks for a great product!